Conventional foundation making takes a long time and also costs a lot. By using piles, the foundation will be completed in a very short time. The piles will be staked until it hits the hard ground. Prior to erection, it is better to do sondir first to determine the depth of the hard soil. Piling can be done using a Drop Hammer or Jack Pilling System.
Product Spesification :
Length | 3 m & 6 m for non prestressed
For prestress, as you need |
Weight | Δ 28.28 = 83 kg/m | Δ 32.32 = 105 kg/m
∏ 20.20 = 94 kg/m | ∏ 25.25 = 147 kg/m |
Concrete Quality |
K-450 (non prestressed) & K-500 (prestressed) |
Reinforcement Spiral | 5 mm (0.2 mm tolerance) |
Carrying Capacity |
Δ 28.28 (D13 = 30 ton) | Δ 32.32 = (D16 = 40 ton)
∏ 20.20 (D13 = 35 ton) | ∏ 25.25 = (D16 = 50 ton) |
Joint | piling head plate with welded spliced |
Erection System |
1. Drop Hammer |
Head of the pile |
made pressed and welded to the main reinforcement become more monolith |